Managing stakeholder consultation

Ecofys supported the Dutch transmission grid operator TenneT in the stakeholder consultation process with regards to the intended offshore grid in the Dutch part of the North Sea. We supported the stakeholder consultation with respect to all technical, legal and planning aspects of the realisation of the offshore electrical infrastructure. The aim of these consultations was to achieve optimum configuration and realisation at lowest public cost.

All relevant stakeholders were invited to give their input on the topics at hand to ensure all concerned parties are aware which and when decisions are taken and which considerations have been taken into account. Feedback from candidates for the tender has been collected in separate meetings, and stakeholders have been welcome to give their input through a dedicated consultation website. The stakeholder consultation resulted in a broad set of technical and legal choices made by TenneT in consensus with the different stakeholders.

Please find more information at: tennet.eu

Contact

Michiel Müller
Management Team
E-mail
Anna Ritzen
Energy Systems and Markets
E-mail
Offshore wind (c) Ecofys